GrowerSELECT- GROW-DISK Chain Feeding System Assembly & Operating Instructions

Hog Slat Inc. Newton Grove, NC USA December 2022 19 GROW-DISK™ Feed System 8. Push the cable/fish tape again through the outgoing tube at the first corner until it comes out at the next corner. 9. Pull the conveyer chain from the second corner through the tubing. If the section of tubing is longer than the chain, connect a new section of chain. (Details step 7) 10. Repeat this process (step 8 & 9) until the conveyer chain is pulled through the complete conveyer tubes, all corners, chain disk fill hopper and closed the loop at the other side of the Drive Unit. 11. Before you can install the conveyer chain in the Drive Unit; pull on the chain and disks until all the slack has been removed from each sides of the chain loop! 12. Confirm the conveyer chain is tight on the wheel at each corner. 13. Disconnect tensioning springs by using “T” handle (1). This will allow the idler tensioning wheel (2) to move towards the drive sprocket. 14. Wrap one end of the chain around the idler tensioning wheel and the other end of chain onto the drive sprocket (3). 15. Position the Safety Switch (4) into the center of the slide. This will prevent the initial startup movement from causing an erroneous activation of switch due to any slack in chain or stretching of chain. 16. Cut the ends of each chain so that the connection can be made in a convenient location. 2 1 4 3

RkJQdWJsaXNoZXIy MTA3MzU=