GrowerSELECT® Installation Manuals Binder

Hog Slat Inc. Newton Grove, NC USA Aug 2015 3 Ventilation System Wiring Instructions: Loosen the two wing nuts holding switch and remove switch cover. Remove wire knockouts from switch cover. Route each wire through the wire knockout opening. Connect wires to either “Normally Open” or “Normally Closed” depending upon application. Figure 5 Route wiring away from moving parts . Protect wiring from sharp edges and use liquid tight connectors when running through wall surfaces. Final adjustment: With the whisker actuator on top of the load block, adjust switch angle by loosening the wing nuts and rotating the switch up then slowly downward until the switch activates. While holding switch body in position, re-tighten wing nuts. Figure 6 SWITCH RATING: 15A @ 125, 250, 480 VAC

RkJQdWJsaXNoZXIy MTA3MzU=