GrowerSelect GROW-FLEX Auger Feed System Installation Operation Manual

Hog Slat Inc. Newton Grove, NC USA August 2021 41 Grow-FlexTM Feed System Figure 19 shows the proper assembly of the Model 75, 90, & HR anchor components. Insert the anchor into the auger until the auger touches the anchor flange. The auger must be threaded onto the Auger Clamp Pin. Tighten the clamp pin set screw on the auger. Figure 19. Model 75, 90, & HR Anchor and Bearing Assembly 1 Anchor Bearing Clamp 2 Anchor Bearing Assembly 3 Auger Clamp Pin 4 Auger 5 Unloader Some of the Unloader Models have Anchor and Bearing Assemblies with Restrictors that may be shortened, if necessary, to increase capacity. 9. Carefully remove the locking pliers and attach the Anchor Bearing Assembly to the Unloader with Anchor Bearing Clamp. 10. Place a HS527 cannonball into the unloader. 11. Follow the GrowerSELECT Grow-Flex Feed Auger Run-in Procedure (see page 47) prior to starting system.

RkJQdWJsaXNoZXIy MTA3MzU=