Hog Slat Inc. Newton Grove, NC USA February 2019 23 Ventilation System Section 8: Top Cable Pulley or Sprocket Replacement Tools Required: 5/16" socket/wrench/drill driver 1/2" socket/wrench 17mm socket/wrench 8.1 Removal of Cable Pulley or Sprocket A. Disconnect power. B. Disconnect all cables /chains from load block assembly and pull out of machine. C. Remove machine from wall or mounted location. D. Remove top end cap from machine by removing (4) mounting screws found on each side of the chassis using 5/16" socket. E. Remove (8) bolts securing the cable pulley/sprocket mounting bracket to the machine chassis using 1/2" wrench. These are located near end of machine and each side of chassis. Access windows are located on back side of chassis to aid in removal of nuts for the lower inboard fasteners. F. Pull cable pulley / sprocket assembly from end of machine.
RkJQdWJsaXNoZXIy MTA3MzU=