Hog Slat Inc. Newton Grove, NC USA February 2019 9 Ventilation System K. Rotate shaft until it has cleared the load nut and load nut can be removed from the machine. L. If replacing snap ring, pull aluminum load block up and off the end of the drive screw so the snap ring can be removed. 2.2 Installation of Load Nut A. Re-install snap ring over shaft end. B. Place load block over shaft end and let it hang down supported by the attached cable/chain. C. Thread new load nut onto end of drive screw until it gets to the aluminum load block.
RkJQdWJsaXNoZXIy MTA3MzU=