Hog Slat Inc. Newton Grove, NC USA February 2022 6 Evaporative Cooling System 8. Once location is identified prepare to install tank fitting. Please note the bulk head should always be located on the trough, roughly 4” from the end of the system. If the system is on concrete the hole should be located 1.25” from the bottom of the trough, if the system is mounted on brackets the tank fitting may be located on the bottom of the trough provided there is a minimum of 12” clearance between the bottom of the trough and the ground. See image below for details about hole location. A 1-1/2” hole saw should be used.