Hog Slat Inc. Newton Grove, NC USA March 2022 10 Evaporative Cooling System Trough Cover Installation 11. Using supplied #10 X 1.5” supplied screws secure trough cover to top of bottom 2X10 while inserting to cut section of trough. Start at the sump end and work towards the cap end. It may be necessary to cut the trough cover to fit nonstandard rough opening lengths. If necessary, drill a second mounting hole to ensure a minimum of 2 fasteners on a modified part.
RkJQdWJsaXNoZXIy MTA3MzU=