Hog Slat Inc. Newton Grove, NC USA March 2022 12 Evaporative Cooling System Top Assembly Instructions 1. Install the Top Support Flush with the header boards as shown in Figure 1. As shown above in Figure 1 there should be a 2”X4” spacer located behind the Top Support. (Please note that this spacer should terminate when the Top Support ends). At this time the Top Support should be fastened to the header bar with two screws (80509) on the far ends. This should be replicated throughout the length of the system. 2. The Spray Bar Support should be fastened to the Top Support with two screws (80509) and two washers (605791) as shown in Figure 10 below. This process should be replicated throughout the length of the system. 3. The Spray Deflector should be fastened to the Top Support using self tapping sheet metal screws (60926) as shown in Figure 11 below. The Spray Deflector should be fastened to the Top Support first utilizing the middle two holes as well as on the two ends where End Panels reside. 4. The Deflector Splice should be fastened to the Spray Deflector anywhere there is a meeting of two Spray deflectors with sheet metal screws (60926) as shown below in Figure 12. This process should be replicated throughout the length of the system. Figure 10 Figure 11 Figure 12
RkJQdWJsaXNoZXIy MTA3MzU=