GrowerSELECT HSES Evaporative Cooling System Installation Manual

Hog Slat Inc. Newton Grove, NC USA March 2022 14 Evaporative Cooling System IN LINE JET PUMP Trough Assembly Instructions • ALL TROUGH ASSEMBLY SHOULD TAKE PLACE IN FINAL RESTING PLACE OF TROUGH (ON BRACKETS OR ON CONCRETE) • ENSURE PVC CEMENT IS NOT ALLOWED TO POOL IN CORNERS OF COUPLERS AND GLUE IS NOT HEATED BEFORE APPLICATION, FAILURE TO DO THIS CAN RESULT IN TROUGH WARPAGE. 1. Begin on the end of the system oriented away from the Pump/Float Housing and place a 10 foot section of trough onto the Trough Support Brackets or Concrete pad. 2. Using PVC Cleaner, clean the first and last 3” of the Trough both inside and out. 3. Using the supplied PVC cement, fill the channel of the Trough End Cap Nipple with the PVC Compound and slide onto the Trough. 4. Utilizing the same PVC cement and process, repeat for a Trough Splice and slide onto the opposing end of the 10’ Trough section. 5. Using the methods above, repeat cleaning and applying PVC cement to Trough sections and Trough Splices throughout the length of the system. 6. After the final section of 10’ (or 5’) trough has been installed, fill the channel of both sides of final Trough Splice and slide onto the end of the trough. 7. Following instructions above, insert the Trough Extension from the Plumbing Kit into the final Trough Splice. 8. Fill the channel of the Flush End Cap with PVC Cement then slide onto the Trough Extension closing the trough. 9. Finally place all Trough Covers onto the length of the Trough and Install 4” Mechanical Plug (HSES33) into End Cap with Nipple. • Figure 13 below depicts a typical 40’ Trough Assembly with Float Tank Extension. Figure 13

RkJQdWJsaXNoZXIy MTA3MzU=