Hog Slat Inc. Newton Grove, NC USA March 2022 17 Evaporative Cooling System Pad Assembly Instructions (NOTE: THE EVAPORATIVE COOLING MEDIA SHOULD MATCH SYSTEM CHARACTERISTICS) BEFORE BEGINNING, MAKE SURE PADS ARE ORIENTED CORRECTLY. REFERENCE CAN BE FOUND ON SIDE OF COOLING PADS. 1. Begin on either end of the system by placing the Evaporative Cooling Pads into the channel on the Trough Cover against the End Panel. 2. Insert Evaporative Cooling Pad into Trough Cover channel for the length of the system ensuring pads are compacted against each other 3. With roughly 3 feet of void remaining, place Evaporative Cooling Pad against remaining End Panel. 4. Continue placing Pad until void is filled. If necessary cut a remaining pad to size to complete filling void. 5. Capture pad with Pad Retainer and Tri Knobs as shown below in Figure 16. Repeat for length of system. 6. Finally, Pad Retainer Clips should be installed on Pad Retainer joints to ensure Pad Retainers remain on the same linear plane as shown below in Figure 17. Figure 16 Figure 17