Hog Slat Inc. Newton Grove, NC USA March 2022 19 Evaporative Cooling System IN LINE JET PUMP Pump Assembly Instructions 1. Begin by mounting the pump plate either to the Pump Plate Side Support Brackets or by anchoring the Pump plate to the concrete. Both methods are shown in Figures 20 and 21 below. 2. Place the Pump on the plates so the intake is oriented towards the system. 3. Utilizing supplied bolts (605082), lock washers (60589) and nuts (60624), secure the Pump to the Pump Plate. Figure 20 Figure 21
RkJQdWJsaXNoZXIy MTA3MzU=