GrowerSELECT HSES Evaporative Cooling System Installation Manual

Hog Slat Inc. Newton Grove, NC USA March 2022 20 Evaporative Cooling System IN LINE JET PUMP Exit Plumbing Instructions 1. Starting with the pump exit, assemble the components as shown below in Figure 22 and 23, using the PVC pipe cleaner and PVC cement supplier with the Plumbing Kit. Both Center Feed and End Feed arrangements are shown below. Figure 22 Figure 23 Please note: 115 Volt pump installation may require a variation in installation. • In 115 Volt Pump installations, the 2” Pump Union (H2P-004) is replaced with a 1 ½” Pump Union (H2P-003). • The required components are included in the corresponding pump kits.

RkJQdWJsaXNoZXIy MTA3MzU=