Hog Slat Inc. Newton Grove, NC USA March 2022 21 Evaporative Cooling System IN LINE JET PUMP Entrance Plumbing Instructions 1. Begin by marking the center point of the intake hole 1.75” from the bottom of the trough and no less than 18” from the end of the system for an end feed configuration. For a center feed configuration, the center point should be marked 1.75” from the bottom of the trough aligned on the linear center of the system. 2. Drill a 2.375” inch diameter hole centered on the point marked in the step before. • Make sure PVC shavings are cleaned from tank after fabrication 3. Secure Bulk Head Fitting and tighten to create a water tight seal. 4. Beginning with the 1 ½” Male PVC Adapter exiting the tank assemble the plumbing to the Pump Intake as shown below in Figure 24. Figure 24