GrowerSELECT HSES Evaporative Cooling System Installation Manual

Hog Slat Inc. Newton Grove, NC USA March 2022 30 Evaporative Cooling System 3. Secure PVC pipe inside of the Float Collar with the thumb screws and attach the 1” Male PVC Elbow and 1” to ¾” PVC Reducing Bushing to the top of the 1” PVC Pipe. Figure 35 • During set up of water level the thumb screws should be used to set the height of the water by raising or lowering the entire valve assembly

RkJQdWJsaXNoZXIy MTA3MzU=