Hog Slat Inc. Newton Grove, NC USA March 2022 5 Evaporative Cooling System Figure 2 Figure 2 above shows the typical spacing for 2”X4” studs during framing along with typical spacing for the Trough Support Brackets (If Applicable). Table B and Table C provide the total framed opening requirement and minimum distance from the ground to the base of the Trough Support Bracket respectively. • Beginning at the end of the system opposing the pump, the first bracket should be located to support the end cap with the extrusion. The second should be placed to support the trough halfway between the end cap and the coupler. The third should be located to support the trough coupler. This process should be repeated through the length of the system. (ENSURE ALL CONNECTIONS ARE SUPPORTED WITH MOUNTING BRACKETS BRACKETS SHOULD BE SPACED NO GREATER THAN 5 FEET APART, IN SOME INSTACES SMALLER SPACING MAY BE DESIRED AND CAN BE ACHIEVED BY ORDERING ADDITIONAL BRACKETS) • If the system is wall mounted, the pump plate side brackets should be installed as shown in Figures 3 & 4. Figure 3 shows End Feed configuration, Figure 4 shows the center Feed Configuration. 40.00 Inch Recommended 40.00 Inch Recommended
RkJQdWJsaXNoZXIy MTA3MzU=