Hog Slat Inc. Newton Grove, NC USA January 2022 4 Turkey Floor Feeding Systems Assembling Feeder Lift Cables: 1. Install Lift Cables to each Feed Level Ring so that the Cable Stop is on outside of Feed Level Ring with Cable on inside of Feed level Ring (Figure 7). Feed Level Ring should be positioned in third hole from bottom for most adult turkey applications. 2. Lift Cables should be fed up and through holes in Pan Shield from bottom. Make sure that all cables are up and through the holes on each side Pan Shield on top of Adult Turkey Feeder (Figure 8 Below). Check for function and free movement by lifting the Feed Ring Assembly with the Lift Cables. 3. Starting with Feeder closest to Winch Assembly, orient Lift Cables toward Winch and attach to main Winch Cable with supplied plastic split bolt nut. Tighten nut securely. Please make sure the Lift Cables are oriented toward the Winch. 4. Once all Feeder Lift Cables are connected, check tightness of all Clamps. Winch up and down several times to check for proper function. Note: Additional adjustment of Feed Level Rings and Lift Cables may be required to achieve desired feed level after Feeder System operates. Figure 7 Figure 8
RkJQdWJsaXNoZXIy MTA3MzU=