GrowerSELECT - Chicken Breeder Nests Side Belt Installation Manual

Hog Slat Inc. Newton Grove, NC USA August 2019 19 Breeder Nest Systems Belt Tracking 42. End Tensioning Tracking: tighten the 3/8” bolt to shift Egg Belt to the left. Loosen the 3/8” bolt to shift the Egg Belt to the right. 43. Nest Table Tracking: Turn Adjusting bolt clockwise to shift Egg Belt to the left. Turn Adjusting bolt counter clockwise to shift Egg Belt to the Right. 3/8” Bolt Adjusting Bolt

RkJQdWJsaXNoZXIy MTA3MzU=