Hog Slat Inc. Newton Grove, NC USA May 2023 6 Poultry Feed Systems Screw Hook Installation Drop Installation 1. Attach a 1-7/8” pulley or larger to each hook. 2. Thread the end of the drop through the pulley toward the winch. Clamp this end to the Main Line about 6” from the last pulley, using a 3/16” cable clamp or 3/16” aluminum sleeve. 3. Allow enough drop length for installation of the Adjustment Leveler. Sufficient cable is included to provide “double back” on drops located beneath and near the winch. “Double Back” Cable Hookup 4. Begin installing suspension drops at the winch and proceed to the ends of the feeder line. Keep the main line tight between drops. It may be necessary to hang a weight on the end of the main line to maintain tension on the line. Main Line Screw Hook Opening Facing Opposite Direction of Travel Winch End Direction of Travel
RkJQdWJsaXNoZXIy MTA3MzU=