Hog Slat - HSVC1024-2C5A Replacement Top Board For Ventilation Manual

Hog Slat Inc. Newton Grove, NC USA May 2024 REV IR 10 Ventilation System SECTION 6 & 7: WIRING INSTRUCTIONS: Reference Section 5 relative to secondary power supply connection and ribbon cable installation. No other connections are required. SECTION 8: SWITCHING LANGUAGES The controller can toggle between English and Spanish language on most all screens. Simply locate the icon on the page to switch to Spanish. Locate the icon to switch to English. The icons do not always appear in the same location but in most cases they will be located next to the yellow function button or lower left corner of the screen. SECTION 9: INITIAL START UP OF CONTROLLER Upon the first power up of the controller, the controller is not enabled. This allows user to perform minimal set up of stages so that when the controller is enabled all stage outputs are assigned to the appropriate type devices. On the initial screen a notification will be shown indicating an initial set up is required.

RkJQdWJsaXNoZXIy MTA3MzU=