Hog Slat - HSVC1024-2C5A Replacement Top Board For Ventilation Manual

Hog Slat Inc. Newton Grove, NC USA May 2024 REV IR 11 Ventilation System Press the MENU button. This will go to the HOME screen. Go through the below listed highlighted in blue buttons to set up the minimum parameters required. NOTE: If you choose not to perform the minimum set up, the controller will default to all output stages as cooling with no heat or mist cooling, one probe and Stage 1 and 2 fans to curve “1”. 1. SETTINGS: Assign the appropriate motor curve for Stage 1 and Stage 2 fans. (see section 10, item 14E and 14F) 2. HEAT: (see section 10, item 18) assign number of heaters (if used). Heaters are assigned to stages 5 and 6 depending on the number of heaters being used. If none, then Stage 5 and 6 are cooling stages. 3. MIST COOLING: (see section 10, item 19). If mist cooling is used, press ACTIVATE. Mist cooling is assigned to the last cooling stage available. For example Mist Cooling is assigned to Stage 6 if no heaters. Stage 5 if one heater and Stage 4 if two heaters. 4. PROBES: (see section 10, item 21). Select the number of probes being used. Once the initial set up is complete, Press the ACTIVATE CONTROLLER button found on the HOME screen. Controller will then begin reading the temperature probes and react accordingly. At this point final set up can be performed in terms of setting up each stage temperature set points, alarms, curves etc...

RkJQdWJsaXNoZXIy MTA3MzU=