Hog Slat Inc. Newton Grove, NC USA May 2024 REV IR 9 Ventilation System 7. The new touchscreen requires an auxiliarly power supplied (included) The screen will not turn on until this is connected. Connect the RED lead to the AUX (+) terminal and the BLACK lead to the AUX (–) terminal found on the back of the newly installed front door assembly. 8. Connect the BLUE wire from the auxiliarly power supply to the Neutral or L2 input on the bottom board. Connect the Brown wire from the auxiliarly power supply to the L1 input terminal. 9. Close the front door and set latch on the enclosure. Re-connect the power to the controller. On initial power up the controller will require minimum set up before activating the controller for operation. This is similar to setting DIP switches except the set up occurs through the touchscreen. It is important to perform the initial set up so that the operation of the controller is predictable. Simply follow the instructions below found in SECTION 9. NOTE: The controller by default is set up with all cooling stages (no heat). If you press the activation icon before you have performed the minimum setup in SECTION 9, the controller will default to one probe input, no heat, no mist and all stages will be cooling. You can easily change any set up at any time.
RkJQdWJsaXNoZXIy MTA3MzU=