Hog Slat - Fall Arrest System Instruction Manual

Hog Slat Inc. Newton Grove, NC USA January 2024 6 Feed Bins 8. Insert Rung Reinforcement into the top rung, bottom rung of the roof ladder section, and the top rung of the vertical ladder section. Secure in ladder by adding the bolt provided to each end of the Reinforcement as shown. GST-LS8002 U-Channel ladder rung support for “D” shaped rungs. GST-LS8024 Ladder Rung Support Rod for Round Rung Ladders 7. Attach the Cable guide to the bottom rung on the roof ladder section and top rung on vertical section using the SS 10-24 screws provided. GST-LS8010 and GST-LS8014 for “D” shaped rung Ladders GST-LS8037 and GST-LS8038 for Round Rung Ladders 3. Clamp the two cable tensioning supports around the bottom two ladder rungs and secure using the 3/8-16x2 ½” bolts. Torque to 25 ft. lb. 4. Attach the cable tensioning bracket to the supports and secure using the 3/8”-16x2” bolt. Torque to 25 ft. lb. 5. Add spring, washer, and one 7/16” nut on the slide tensioning rod and place up through the tensioning bracket (thread side down). Pull cable tight and secure to tensioning rod with two cable clamps. Torque cable clamps to 45 ft. lb. 6. Adjust placement of cable tensioning bracket as needed and tighten the tension of the cable using the 7/16” nut and jam lock with the other 7/16” nut.

RkJQdWJsaXNoZXIy MTA3MzU=