Hog Slat Feed Bin Installation Operation English Manual

Hog Slat Inc. Newton Grove, NC USA Sept. 2021 25 Feed Bins 8. Place the extension tubes to the inside of the loops and secure using the HS714 truss head tin bolt and the HS722 Serrated flange nut. 9. Continue working down the tank installing the loops and extension tubes. Only the bell extension uses the larger diameter cage loop. All others are the same size.

RkJQdWJsaXNoZXIy MTA3MzU=