Hog Slat - Pit Scraper System Installation Manual

SCRAPER SYSTEMS Hog Slat Inc. Newton Grove, NC USA February 2022 7 Trouble shooting Power unit will not run: Check fuse or circuit breaker. Have electrician check components in the control panel to make sure all components operate. Check for loose wires. Check for loose belt. Cable slipping: Adjust the cable tension. Wiring Instructions Note: Scraper is to be wired in accordance with all local, state and national wiring codes. All wiring sizes and fuse capacities are to be sized according to national electrical code specifications or other applicable regulations. The recommended switch for the Hog Slat Scraper Systems is a “Maintained” Forward-Off-Reverse 20 amp either 1-Phase of 3-Phase switch depending on electrical supply. “Maintained” means motor or Scraper System stays turned on until operator physically turns system off. Caution Scraper System should never be left unattended during operation. Serious physical injury or system damage could result from a Scraper System being unattended. Check and make sure the motor voltage corresponds to the supply voltage. 1-Phase 4-Wire Motor Connection The connection diagram below is for a typical connection of a 1-phase 4 wire motor. It is applicable for either 115 or 230 volts. To ensure proper connection, please refer to the motor nameplate for specific connection details and voltage settings.

RkJQdWJsaXNoZXIy MTA3MzU=